Guide: takeoff pricing

How much does a construction takeoff cost?

Published prices, by job size, from Bidmere and from other firms that publish theirs, plus what moves the number.

Short answer

A construction takeoff from Bidmere costs from $149 for one trade: $149 to $295 on a small job up to 10,000 SF, $295 to $695 on a mid-size job up to 50,000 SF, and from $695 on larger jobs, ready in 48 hours. Other firms that publish prices list single-trade takeoffs from about $150 to $1,000 depending on size.

Working on a live bid? Send the plans and specs. Fixed quote within 2 business hours. Plan review is free, and you pay only after you accept.

Get a fixed quote

Bidmere takeoff prices by job size

Job sizeTakeoff only (quantities)Single-trade estimate (quantities and pricing)
Small: up to 10,000 SF$149 to $295$195 to $395
Mid-size: 10,000 to 50,000 SF$295 to $695$395 to $895
Large: over 50,000 SF, or several buildingsFrom $695From $895

Single-trade work is ready in 48 hours. Rush (24 hours) adds 30%, and you get 25% off your first estimate. Every job gets a fixed quote within 2 business hours, and you pay only after you accept. Full list on pricing.

What other firms publish

Firm or sourcePublished priceChecked
World EstimatingAbout $200 for a specific trade takeoffNovember 9, 2026
Edge Estimates (subcontractors)From $250November 9, 2026
The Virtual Estimation (survey of its own rates)Residential single trade $150 to $800; small commercial single trade $300 to $1,000; commercial multi-trade $800 to $3,000November 9, 2026

These are each firm’s own published claims, linked under Sources. For estimating fees and in-house costs, see construction estimating cost.

Short on time? Send the plans and specs and we do this for you. Fixed quote within 2 business hours. Plan review is free, and you pay only after you accept.

Get a fixed quote

What changes the price of a takeoff?

  • Size of the plan set: sheets, buildings and floors
  • Number of trades
  • Complexity: renovation and phasing take longer than repetitive new work
  • Completeness of the drawings and specifications
  • Detail: a budget range or a bid-day number with alternates
  • Deadline: standard or rush

What is included in a takeoff

Measured quantities by trade, area and sheet, in your units, with color-coded marked-up PDF plans. A takeoff has no pricing; a single-trade estimate adds a cost summary at your rates with assumptions, exclusions and open questions. See what a takeoff is and quantity takeoff services.

How long does a takeoff take?

Bidmere single-trade work is ready in 48 hours from your accepted quote and complete documents, or 24 hours with rush. Multi-trade work gets a delivery date in the quote.

Frequently asked questions

How much does a construction takeoff cost?

At Bidmere, from $149 for one trade on a small job, $295 to $695 on a mid-size job and from $695 on large jobs. Other firms publish single-trade takeoffs from about $150 to $1,000 depending on size.

Is a takeoff cheaper than an estimate?

Yes. A takeoff is quantities only. At Bidmere a takeoff starts at $149 and a single-trade estimate with pricing at $195.

How long does a takeoff take?

48 hours for one trade at Bidmere, 24 hours with rush, from your accepted quote and complete documents.

Do I pay before I see the price?

No. You get a fixed price within 2 business hours, plan review is free, and you pay only after you accept.

Get a fixed quote

Share the project basics. You get a fixed price and delivery date within 2 business hours. Plan review is free, and you pay only after you accept.

A sentence or two is enough. Leave private rates out of this box.
Add details (optional)
Share a view-only link if you have one. It lets us quote faster; you can also send documents after we reply.

Preparing the form…

* Required. We reply by email within 2 business hours. Plan review and quotes are free.

Sources

Need it done? Fixed price in 2 hoursGet a quote