Estimating by trade and by stage
Construction estimates, measured from your plans.
Quantity takeoffs and cost estimates for commercial trades, from budget numbers on early plans to bid-day estimates and change orders. Your rates, your review, your number.
Trades
Pick the trade. We measure the scope.
Each trade page shows what is measured, the documents needed and a takeoff sheet. Tell us the trade and the plan set, and we confirm availability when we review the scope.
- Painting09 91 13Division 09: Finishes
- Drywall09 21 16Division 09: Finishes
- Flooring09 65 00Division 09: Finishes
- Ceilings09 51 13Division 09: Finishes
- Doors08 11 13Division 08: Openings
- Electrical26 05 00Division 26: Electrical
- Plumbing22 11 16Division 22: Plumbing
- HVAC23 31 13Division 23: Heating, Ventilating and Air Conditioning
- Concrete03 11 00Division 03: Concrete
- Masonry04 05 00Division 04: Masonry
- Roofing07 22 00Division 07: Thermal and Moisture Protection
- Sitework31 22 00Divisions 31 and 32: Earthwork and Exterior Improvements
- Whole project01Divisions 01 to 33: Whole project
One plan set, eight interior trades
Switch trades. Watch the plan change.
The same office, measured eight ways. Choose a trade, then point at a line to see exactly what was counted.
- Wall preparation3,636 SF
- Walls, two finish coats3,636 SF
- Gypsum ceilings1Callout 1: Corridor 162 SF, break room 255 SF417 SF
- Doors and frames2Callout 2: 2 of 8 are exterior doors8 EA
- Accent wall3Callout 3: Conference room east wall126 SF
- Partition type A85 LF
- Partition type B, sound rated1Callout 1: 53 LF around the conference room and restroom53 LF
- Exterior wall furring2Callout 2: 182 LF along every exterior wall, corner marked182 LF
- Gypsum board ceilings417 SF
- Framed openings20 EA
- Carpet tile CPT-11,348 SF
- Luxury vinyl tile LVT-1417 SF
- Porcelain tile PT-11Callout 1: Restroom, thinset on the prepared slab195 SF
- Rubber base RB-1452 LF
- Transition strips2Callout 2: 6 at changes in finish6 EA
- Acoustical panel ceiling ACT-11Callout 1: 145 panels in the open office1,348 SF
- Moisture-resistant panels ACT-22Callout 2: Restroom, moisture resistant195 SF
- Perimeter wall angle376 LF
- Hanger wires and bracing1,543 SF
- Hollow metal frames8 EA
- Flush wood doors1Callout 1: 4 open onto the corridor6 EA
- Hollow metal doors2Callout 2: 2 exterior, insulated2 EA
- Hardware sets HW-1 to HW-38 EA
- 2x2 LED troffers1Callout 1: 12 in the open office24 EA
- LED downlights2Callout 2: 10 in the corridor and break room10 EA
- Duplex receptacles42 EA
- Switches and occupancy sensors14 EA
- Branch conduit and wire3Callout 3: 4 home runs to LP-11,850 LF
- Panelboard LP-11 EA
- Water closet1Callout 1: 1 water closet and 1 lavatory in the restroom1 EA
- Lavatory1 EA
- Break room sink1 EA
- Water heater2Callout 2: 1 heater and 1 sink at the break room wall1 EA
- Domestic water piping120 LF
- Sanitary waste and vent90 LF
- Supply ductwork130 LF
- Supply diffusers1Callout 1: 6 in the open office18 EA
- Return grilles8 EA
- VAV terminal units2Callout 2: 3 boxes along the corridor trunk3 EA
- Restroom exhaust fan3Callout 3: 1 in the restroom1 EA
Estimate types
The right estimate for the stage you are in.
Early plans support a budget range. Construction documents support a bid-day number. We scope the estimate type to the documents you actually have.
Tell us the trade and the plan set.
Share the project basics. We confirm fit, deliverables and a fixed quote before any work begins.