Divisions 31 and 32: Earthwork and Exterior Improvements31 22 00 · 31 23 00 · 32 12 16
Sitework and earthwork estimates
A sitework and earthwork estimate is a takeoff and cost summary of the grading, excavation, paving and site utilities on your civil plans.
- Excavation180 CY
- Structural fill120 CY
- Asphalt paving1Callout 1: Parking area with striped stalls1,067 SY
- Concrete curb and gutter320 LF
- Concrete sidewalks640 SF
- Storm structures2Callout 2: 2 inlets, CB-1 and CB-22 EA
The service
What you send. What you get.
You send
- Civil grading, paving and utility plans with existing and proposed grades
- Geotechnical report
- Specification sections for earthwork and paving
- Survey or surface files, if available
- Addenda and the equipment, labor and material rates you want applied
Start with a short description. We arrange document sharing after confirming the work.
You get
- Earthwork quantitiesCut, fill and net volumes by area, with the surfaces and stripping depth used stated.
- Paving and curb takeoffPavement area by section and curb by type, tied to sheet and revision.
- Utility and structure countsPipe by size and material and structures by type.
- Cost summaryQuantities priced with your approved equipment, labor and material rates.
Typical buyers: Site and earthwork contractors; Paving contractors; General contractor estimators pricing site scope.
What we measure
Measured from your plans.
The estimate lists cut and fill volumes, paving area by pavement section, curb lengths and structure counts, priced with rates you approve, with soil and grading assumptions written out. We confirm fit and a fixed quote after reviewing your documents.
- Cut and fill volumes from existing and proposed surfacesCY
- Paving by pavement sectionSY or SF
- Aggregate base by thicknessSY or tons
- Curb and gutter by typeLF
- Storm structures, manholes and inletsEA
- Storm and utility pipe by size and materialLF
Before we start
Questions to resolve and work not included.
Questions we help identify
- Topsoil stripping depth not stated in the plans or geotechnical report
- Shrink and swell factors to apply to cut and fill
- Allowance for unsuitable soil or rock not defined
- Pavement section on the plan differs from the geotechnical recommendation
Not included
- Surveying, staking and field verification
- Geotechnical investigation or testing
- Dewatering, rock removal and unsuitable soils unless added to the scope
- Civil design and stormwater permitting
Questions
About sitework and earthwork estimates.
What do I need to send for a sitework estimate?
Civil grading, paving and utility plans, the geotechnical report, the earthwork and paving specification sections and all addenda. Surface files help when available, and a priced estimate also needs your equipment, labor and material rates.
How are shrink and swell handled?
Measured bank volumes are reported first. The shrink or swell factors you approve are applied separately, so the adjustment stays visible.
Do you visit the site or check existing grades?
No. Existing grades come from the survey and plans you provide. Differences that need a field check are listed as open questions for your team.