Division 09: Painting and coatings

Commercial painting estimating with labor and material split

Send your plans, finish schedule and painting specs. Get every surface measured by coating system and prep level, with labor and material priced on separate lines at your rates.

Fixed price in 2 business hours. Pay only after you accept.

  • Fixed price before any work starts
  • Plan review is free
  • You pay only after you accept the price and delivery date
  • Single-trade estimates in 48 hours
  • Your rates, your final number

Spanish version: Español

Get a fixed quote

A sentence or two is enough. Leave private rates out of this box.
Add details (optional)
Share a view-only link if you have one. It lets us quote faster; you can also send documents after we reply.

Preparing the form…

* Required. We reply by email within 2 business hours. Plan review and quotes are free.

Painting takeoff Sheet A-601
Floor plan, painting layer, single-story officeEight rooms around a corridor. The layer shows the surfaces, symbols and runs counted in the takeoff, and orange clouds mark what the numbered notes describe.12345678Open office201Conf.204Office205CorridorBreak202Office203Office206Restroom20712329′-0″27′-0″
  • Wall preparation3,636 SF
  • Walls, two finish coats3,636 SF
  • Gypsum ceilingsCallout 1: Corridor 162 SF, break room 255 SF417 SF
  • Doors and framesCallout 2: 2 of 8 are exterior doors8 EA
  • Accent wallCallout 3: Conference room east wall126 SF
Fictional office example. Quantities counted from the sample plan; not a customer project or pricing recommendation.
Painted surfaces, measured room by room.

Quick answer

Commercial painting estimating from Bidmere turns plans and specs into a measured takeoff and cost summary for painting contractors and general contractors. You get surfaces by coating system, prep level and room, labor and material priced separately at your rates, and proposal-ready inclusions and exclusions. Estimates are priced from $195 and are ready in 48 hours.

What commercial painting estimating includes

You get a painting number broken out the way a painting contractor prices and presents it. Every quantity cites its sheet and revision.

You send

  • Floor plans, elevations, building sections and reflected ceiling plans
  • Painting and coating specification sections
  • Finish and color schedules, and the door schedule
  • Structural and mechanical plans if exposed steel, deck, duct or pipe is painted
  • Addenda, and your labor rates, production rates and material prices

See what to gather for a painting estimate for a full list.

You get back

  • Surfaces by room or area, substrate, coating system and prep level
  • Labor and material on separate lines for every system
  • Gallons by product, from the coverage rate and coat count
  • Access and equipment lines, such as lifts for high work
  • Inclusions, exclusions and clarifications, ready for your proposal
  • A question log of conflicts and scope splits

Delivery is an Excel estimate with live formulas, color-coded marked-up PDF plans, and a written list of assumptions, exclusions and open questions.

How labor and material are separated in a painting estimate

Labor and material are priced on separate lines for every coating system. You can see what each one costs and change either one.

  • Labor comes from the measured area divided by your production rate per coat, times your labor rate. Prep, primer and finish coats each get their own production rate.
  • Material comes from the area times the coat count, divided by the coverage rate for the product. Coverage follows the manufacturer data or the dry film thickness the spec requires.
  • Waste and loss on material is a separate, visible percentage.
  • Sundries are an allowance you set.
  • Equipment such as scissor lifts and boom lifts is carried by duration.

If you have your own production rates, they are used. If not, the estimate states the rate used for each line so your team can adjust it.

Surface preparation, priced as its own scope

Surface prep often costs more labor than the finish coats. It is measured and priced separately, by substrate and prep level.

  • New gypsum board. Primer or sealer over the finish level the drywall spec requires.
  • CMU. Block filler before finish coats, measured by face area.
  • Previously painted surfaces. Cleaning, scuff sanding and spot priming, as specified.
  • Structural steel. Prep follows the SSPC level in the spec, such as SP 2 hand tool or SP 3 power tool cleaning. Touch-up of shop primer is a separate line.
  • Galvanized steel. Cleaning and a compatible primer, if the spec requires paint.
  • Concrete. Cleaning or profile prep before sealers or coatings.

Repairs beyond the specified prep are listed as exclusions or allowances you approve. They are never hidden inside an area rate.

Fire stations, apparatus bays and exposed structure coatings

Fire stations, EMS stations and maintenance buildings combine finished office space with high, exposed vehicle bays. The bays usually carry the most risk in a commercial painting bid.

  • Exposed deck and joists. Overhead steel is measured as plan area times a stated factor for flutes and joists, which you approve. Dryfall coatings are common here, when specified.
  • Exposed duct, pipe and conduit. Measured by LF or by an area allowance, per the spec.
  • CMU walls. Block filler plus epoxy or high-performance finish coats in wash-down areas.
  • Decon, turnout gear and hose rooms. Often epoxy wall coatings per section 09 96 56.
  • Bollards and safety markings. Safety yellow, counted by EA or LF.
  • Overhead doors and frames. Check if factory finished or field painted.
  • Bay floors. Resinous floor coatings are often section 09 67 23, which may sit with flooring, not painting.
  • Access. Lifts for bay heights, and work around vehicles in occupied stations.

Each item is a separate line, so you can carry, exclude or price it as an alternate.

What a painting takeoff measures, by CSI section

A painting takeoff measures every surface the finish schedule and specs call to be coated. Most of the work falls into these MasterFormat sections.

Scope item Typical CSI section Unit
Interior walls and ceilings by system 09 91 23 SF
Exterior walls, trim and soffits 09 91 13 SF, LF
Doors and frames by finish 09 91 23 EA, sides
Staining and clear finishes 09 93 00 SF, LF
High-performance coatings 09 96 00 SF
Epoxy coatings 09 96 56 SF
Exposed steel, deck, duct and pipe 09 91 23 or 09 96 00 SF, LF
Trim, base and handrails 09 91 23 LF

Painting plan conflicts that cause bid misses

Painting bids are often lost on documents that disagree. These are the conflicts the question log flags most:

  • The finish schedule sheen conflicts with the painting spec.
  • Door frames are factory finished on one sheet and field painted on another.
  • Exposed ceilings, deck and duct are not marked painted or left as is.
  • Primer and coat count over new gypsum differs between spec and schedule.
  • Rooms on the plan are missing from the finish schedule.

Each item cites the sheets involved, so your team can send an RFI or qualify the bid.

Have plans for this scope? Send them over. Fixed quote within 2 business hours. Plan review is free, and you pay only after you accept.

Get a fixed quote

Scope gaps between painting and adjacent trades

These items are where painting bids gain or lose money. Check each one before bid day.

  • Shop primer vs field paint on structural steel and miscellaneous metals.
  • Factory-finished items: doors, overhead doors, louvers, toilet partitions.
  • Exposed MEP: painted by the painting sub or by the MEP trades?
  • Drywall finish level. Who brings walls to the level the paint needs?
  • Floor coatings and sealers: painting, flooring or concrete?
  • Pavement and line striping: painting or paving?

Painting estimate to proposal: formatted for your bid

The estimate is organized so it can go straight into your painting proposal. You choose the breakdown.

  • By area or building zone, such as office, apparatus bays and exterior.
  • By coating system, so the GC can compare against specs.
  • Base bid, alternates and unit prices, each on its own line.
  • Inclusions, exclusions and clarifications written in plain proposal language.

Need the full proposal prepared too? See subcontractor proposals. Your team reviews, signs and submits it.

What the painting estimate does not include

The estimate measures and prices work as drawn and specified. Field work and design choices stay with others.

  • Site visits or field verification of existing surfaces
  • Hazardous material testing or abatement, such as lead paint
  • Coating selection, color decisions or code review
  • Signing or submitting your bid

Painting estimating software, templates and painting cost per square foot

Painting estimating software helps a painting estimator measure and price faster. It does not decide what gets painted. That still comes from the finish schedule, the spec and the question log.

Tools painting contractors commonly use:

  • PaintScout describes itself as estimating and sales software for painting contractors.
  • STACK offers painting takeoff software that measures walls, floors and ceilings while excluding doors and windows.
  • Bluebeam Revu measures lengths, areas and counts directly on PDF drawings.

What software does not do:

  • Read Division 09 for coats, sheen, primers and prep
  • Spot finish tags missing from the room schedule
  • Find paint scope in other divisions, such as exposed structure or piping
  • Write the clarifications for your proposal

A painting estimate template works for small jobs. The free construction estimate template fits painting if each surface and paint system gets its own row. Use SF for walls and ceilings, LF for trim and EA for doors and frames. Keep the labor and material columns separate.

There is no honest single painting cost per square foot. It moves with surface type, prep level, number of coats, height and occupied conditions. The painting estimate calculator gives a cost per square foot at your own rates. For building-level benchmarks, see construction cost per square foot.

Outsource when the set is large or bids stack up. Compare the options in estimating software vs a service.

Sample takeoff

What a takeoff looks like

ItemQuantityUnitBasis and split
Office walls, gypsum: primer plus 2 coats eggshell8,940SFA-101, finish schedule; labor and material lines
Gypsum ceilings: 2 coats flat3,120SFRCP A-201
Bay CMU walls: block filler4,860SFA-102, spec 09 96 00
Bay CMU walls: 2 coats epoxy4,860SFFull height over block filler, per spec
Bay exposed deck and joists: dryfall4,200SFPlan area 3,500 SF times 1.2 stated factor
Exposed duct and pipe in bays620LFM-102, P-102
Hollow metal doors and frames26EADoor schedule A-801, both sides
Bollards, safety yellow8EAA-102
Exterior steel canopy: SP 3 prep plus 2 coats740SFS-201, prep on separate line
Scissor lift, bays6DaysEquipment line, 24 ft bay height

Fictional example: part of a painting estimate for an invented 9,500 SF two-bay fire station. Not a customer project.

Before you send plans

Common questions about handing off the work

Will I see labor and material separately?

Yes. Every coating system has its own labor and material lines at the rates you approve.

Will my production rates be used?

Yes, if you provide them. If not, the rate used for each line is stated so you can change it.

Who owns the final painting bid?

Your team reviews, sets markup, signs and submits. Bidmere does not sign or submit bids.

Painting takeoff and estimate pricing

Painting takeoffs from Bidmere start at $149, and single-trade painting estimates at $195. The fixed quote for your job usually lands in these ranges:

Job sizeTakeoff only (quantities)Single-trade estimate (quantities and pricing)
Small job: up to 10,000 SF$149 to $295$195 to $395
Mid-size job: 10,000 to 50,000 SF$295 to $695$395 to $895
Large job: over 50,000 SF, or several buildingsFrom $695From $895

Single-trade estimates are ready in 48 hours. Rush (24 hours) adds 30%. 25% off your first estimate. Every job gets a fixed quote within 2 business hours, and you pay only after you accept. Every estimate is delivered as an Excel estimate with live formulas, color-coded marked-up PDF plans, and a written list of assumptions, exclusions and open questions. See pricing for the full price list and scope conditions.

Monthly estimating plans

Bid every week? Put your painting estimating on a monthly plan

If your team bids every week, a monthly plan is simpler than ordering one estimate at a time. You send bids as they come in, and each one is measured and priced the same way.

  • Starter: $1,395 per month for up to 6 bids
  • Pro: $2,595 per month for up to 12 bids
  • Scale: $4,795 per month for up to 25 bids

Each plan uses your rates, your cost codes and your proposal format, so your numbers stay consistent from bid to bid. See monthly outsourced estimating plans for what each plan covers.

Questions

Frequently asked questions

How much do painting estimating services cost?

Bidmere single-trade painting estimates are priced from $195 for a qualifying project, with 25% off your first estimate. The fixed price depends on floor area, coating systems, exposed structure and deadline. You get it within 2 business hours after a free plan review, and you pay only after you accept. See pricing.

Can labor and material be separated in the estimate?

Yes. Every coating system is priced with labor and material on separate lines. Labor comes from your production and labor rates, and material from coverage rates and coat counts. Prep, primer and finish coats each have their own lines, and equipment such as lifts is carried separately.

How long does a painting estimate take?

A qualifying single-trade painting estimate is ready in 48 hours from your accepted quote and complete documents. Larger or multi-building projects get a delivery date in the fixed quote. Rush: 24-hour rush for 30% more, subject to capacity. Tell us your bid date when you request a quote.

What do I need to send for a painting takeoff?

Send floor plans, elevations, sections, reflected ceiling plans, the finish and door schedules, painting specs and all addenda. Add structural and mechanical sheets if exposed steel, deck or duct is painted. To get a quote, a short description and a plans link are enough. See the plans-needed guide for detail.

Do you estimate apparatus bays and exposed structure?

Yes, when the documents define the surfaces and coating systems. Exposed deck and joists, duct and pipe, CMU with block filler, epoxy wall coatings, bollards and lifts are each separate lines. The factor used for fluted deck and joists is stated, and your team approves it before pricing.

How is surface preparation priced?

Prep is measured and priced by substrate and prep level, separate from finish coats. That covers primer on new gypsum, block filler on CMU, SSPC prep levels on steel and cleaning on existing surfaces. Repairs beyond the specified prep are listed as exclusions or approved allowances, not hidden in an area rate.

Can the estimate be formatted for my painting proposal?

Yes. The estimate can be organized by area, by coating system, or by base bid, alternates and unit prices, with inclusions, exclusions and clarifications written for your proposal. If you want the proposal itself prepared, ask about subcontractor proposal support. Your team reviews, signs and submits.

Can I order a painting takeoff only?

Yes. A painting takeoff lists surfaces by room, substrate, coating system and prep level, plus doors, frames and trim, with no pricing applied. Your team prices it with its own labor, production and material rates. Takeoffs are priced from $149; see quantity takeoff services.

What is a typical painting cost per square foot?

There is no single figure that holds across jobs. Painting cost per square foot changes with the surface, prep level, number of coats, ceiling height and whether the space is occupied. Bidmere does not publish one. The free painting estimate calculator gives a cost per square foot at your own rates. A bid needs measured quantities priced at your rates.

Is painting estimating software better than a painting estimator?

Software measures faster, but someone still has to read the finish schedule and spec, and list what is excluded. If your estimator has open hours, software may be enough. If bids pile up, an outside painting estimator adds the hours. Bidmere quotes a fixed price within 2 business hours, and you pay only after you accept.

Get a fixed quote

Share the project basics. You get a fixed price and delivery date within 2 business hours. Plan review is free, and you pay only after you accept.

A sentence or two is enough. Leave private rates out of this box.
Add details (optional)
Share a view-only link if you have one. It lets us quote faster; you can also send documents after we reply.

Preparing the form…

* Required. We reply by email within 2 business hours. Plan review and quotes are free.

Fixed price in 2 business hoursGet a quote