Divisions 27 and 28: communications, security and fire alarm
Low voltage estimating for cabling, security, AV and fire alarm contractors
Bidmere counts devices, measures cable runs and takes off pathways for structured cabling, access control, video surveillance, AV and fire alarm, system by system, then prices them at your rates.
Fixed price in 2 business hours. Pay only after you accept.
- Fixed price and delivery date before any work starts
- Plan review is free, and no files are needed to get a quote
- You pay only after you accept the fixed price
- Single-trade estimates in 48 hours from complete documents
- Priced at your rates; your team sets the final number
Quick answer
A Bidmere low voltage takeoff counts every device by system and type, measures each cable run from device to closet or panel, and lists pathways separately. Takeoffs are from $149 and single-trade estimates from $195, ready in 48 hours.
Quick answer
Bidmere low voltage estimating gives cabling, security, AV and fire alarm contractors a takeoff by system: devices by type, cable by run and type, and pathways as their own lines. Takeoffs are from $149 and single-trade estimates from $195, ready in 48 hours. For power and lighting, see electrical estimating.
Which low voltage systems does the takeoff cover?
In the CSI MasterFormat used for most project manuals, Division 27 covers communications and Division 28 covers electronic safety and security. Division 27 includes cabling, racks and pathways (Montgomery County cabling standard), and fire alarm is section 28 46 00 in state specifications such as this Delaware project manual.
| System | Division | Counted by |
|---|---|---|
| Structured cabling: data, voice, wireless access points | 27 | Outlet, cable, termination |
| Audio and video | 27 | Display, speaker, plate, cable |
| Access control and intrusion | 28 | Door, reader, contact, panel |
| Video surveillance (CCTV) | 28 | Camera, mount, cable, recorder port |
| Fire alarm | 28 | Device, circuit, panel |
| Pathways for any system | 27 or 28 | Conduit, J-hook, tray, sleeve |
Device counts: what is counted, and from which sheets
- Cabling: outlets by port count and wireless access points, from the technology plans and legend
- Access control: each door with reader, lock interface, contact and request-to-exit, from the security plans and hardware schedule
- Video surveillance: cameras by type and mount, from the camera schedule
- AV: displays, speakers, floor boxes and plates by room
- Fire alarm: detectors, manual stations, notification appliances and modules by type
Each count cites its sheet. Legend and plan conflicts go on the open questions list.
Cable lengths: how runs are measured
Cable is measured run by run, not by floor area: from each device to its telecommunications room, panel or head end along the pathway shown, plus the drop to the device and any rise between floors.
- Each cable type kept apart: copper, fiber, coax, access control and fire alarm circuits
- Cables per outlet multiplied out, so a two-port outlet is two runs
- Slack at the allowance you set, as its own line
- Backbone and riser cable apart from horizontal cable
Pathways: conduit, J-hooks, tray and sleeves
Pathway is often split: the electrician installs empty conduit, back boxes and sleeves, and the low voltage contractor installs J-hooks, tray and cable. The takeoff lists each pathway item with its sheet, so your bid matches the specification and nothing is carried twice or dropped.
- Conduit stubs and back boxes at devices
- J-hooks by spacing along each route
- Cable tray and ladder rack by length
- Sleeves and firestopping at rated walls and floors
Fire alarm takeoffs
A fire alarm takeoff counts initiating devices, notification appliances, modules, panels, power supplies and batteries, and measures signaling and notification circuits by run. Where the design is delegated and few devices are shown, counts follow a basis your team approves, written at the top of the takeoff.
Interfaces get their own lines: duct detectors, sprinkler flow and tamper switches, elevator recall, door holders and fan shutdown, each with who furnishes, installs and wires it.
Have plans for this scope? Send them over. Fixed quote within 2 business hours. Plan review is free, and you pay only after you accept.
Get a fixed quoteWhere low voltage stops and electrical starts
Power to panels and head-end equipment, lighting and the rest of Division 26 belong to the electrical bid: see electrical estimating, which can also carry low voltage lines when you bid both. Electrified door hardware is often split three ways; see doors, frames and hardware estimating.
What should you send for a low voltage takeoff?
- Technology, security, AV and fire alarm plans, risers and legends
- Camera and door hardware schedules
- Division 27 and 28 specification sections and addenda
Single-trade estimates are from $195 and takeoff-only work from $149, ready in 48 hours after you accept a fixed quote. You get the fixed price and delivery date within 2 business hours, plan review is free, and you pay only after you accept.
Takeoff format
What a low voltage takeoff looks like
| System | Item | Unit | Counted from | Note |
|---|---|---|---|---|
| Cabling | Data outlet, 2 port | EA | Technology plans and legend | Two horizontal runs each |
| Cabling | Horizontal cable by category | LF | Measured run by run | Slack shown apart |
| Access control | Controlled door with reader | EA | Security plans, hardware schedule | Lock power split noted |
| CCTV | Camera by type | EA | Camera schedule | |
| Fire alarm | Notification appliance by type | EA | Fire alarm plans | Basis stated if delegated design |
| Pathway | J-hooks | EA | Routes and spacing | By trade per the specification |
Column layout of a low voltage takeoff; quantities come from your drawings.
Before you send plans
Common questions about handing off the work
Do you design the fire alarm system?
No. Bidmere does not design or stamp systems.
Whose labor units do you use?
Yours, or we deliver the takeoff only.
Can you price the equipment?
At your supplier quotes or price list.
Low voltage takeoff and estimate pricing
Low voltage takeoffs from Bidmere start at $149, and single-trade low voltage estimates at $195. The fixed quote for your job usually lands in these ranges:
| Job size | Takeoff only (quantities) | Single-trade estimate (quantities and pricing) |
|---|---|---|
| Small job: up to 10,000 SF | $149 to $295 | $195 to $395 |
| Mid-size job: 10,000 to 50,000 SF | $295 to $695 | $395 to $895 |
| Large job: over 50,000 SF, or several buildings | From $695 | From $895 |
Single-trade estimates are ready in 48 hours. Rush (24 hours) adds 30%. 25% off your first estimate. Every job gets a fixed quote within 2 business hours, and you pay only after you accept. Every estimate is delivered as an Excel estimate with live formulas, color-coded marked-up PDF plans, and a written list of assumptions, exclusions and open questions. See pricing for the full price list and scope conditions.
Monthly estimating plans
Bid low voltage every week? Put estimating on a monthly plan
A monthly plan suits contractors who price this work every week. Starter is $1,395 per month for up to 6 bids. Pro is $2,595 per month for up to 12 bids. Scale is $4,795 per month for up to 25 bids. Each bid follows the same process as a single order: your documents, your rates, your review and your final number. Ask about monthly estimating plans to compare the tiers.
Questions
Frequently asked questions
How much does a low voltage takeoff cost?
Takeoff-only work is from $149 and single-trade estimates with pricing are from $195. You get a fixed price and delivery date within 2 business hours, plan review is free, and you pay only after you accept. See pricing.
Do you do fire alarm estimating?
Yes, as part of a low voltage takeoff or on its own: devices by type, circuits by run, panels and power supplies, with interfaces listed by trade.
Is this the same as an electrical estimate?
No. An electrical estimate covers power, lighting and gear and can add low voltage lines. This takeoff is for the contractor who carries the low voltage systems themselves.
Get a fixed quote
Share the project basics. You get a fixed price and delivery date within 2 business hours. Plan review is free, and you pay only after you accept.
Sources
- Montgomery County, Maryland, cabling standards (CSI MasterFormat Divisions 27 and 28): https://www.montgomerycountymd.gov/government/departments-agencies/technology-enterprise-business-solutions/office-broadband-programs/community-technology/cabling-domain
- State of Delaware project manual, table of contents (28 46 00 Fire Detection and Alarm): https://bidcondocs.delaware.gov/OMB/OMB-MC3511000057A-specs.pdf