Public work: Davis-Bacon and state prevailing wage

Prevailing wage construction estimating for Davis-Bacon and state jobs

Bidmere prices the labor on prevailing wage bids from the wage determination in your bid documents: each takeoff line mapped to a classification, base rate plus fringe, at your crew hours.

Fixed price in 2 business hours. Pay only after you accept.

  • Fixed price and delivery date before any work starts
  • Plan review is free, and no files are needed to get a quote
  • You pay only after you accept the fixed price
  • Single-trade estimates in 48 hours from complete documents
  • Priced at your rates; your team sets the final number

Get a fixed quote

A sentence or two is enough. Leave private rates out of this box.
Add details (optional)
Share a view-only link if you have one. It lets us quote faster; you can also send documents after we reply.
Prefer a call? Leave a number and a time
Optional. We still reply by email, and call only if you ask here.

Preparing the form…

* Required. We reply by email within 2 business hours. Plan review and quotes are free.

Quick answer

On a prevailing wage job, labor is priced from the wage determination: base hourly rate plus fringe for each classification. Bidmere maps every takeoff line to a classification and prices it at your crew hours. Single-trade estimates are from $195.

Quick answer

Bidmere prevailing wage estimates price labor from the wage determination in your bid documents: each takeoff line mapped to a classification at base rate plus fringe, with your crew hours and burden. Single-trade estimates are from $195 and multi-trade from $1,150. This is estimating, not legal or payroll advice.

What changes in a prevailing wage estimate?

The quantities stay the same. The labor price changes, because the wage determination sets the minimum for each classification. We price labor by classification instead of one blended crew rate, carry base rate and fringe as separate columns, and flag work the determination does not list.

The US Department of Labor names misclassification and failure to pay full prevailing wage, including fringe benefits, among the compliance issues that frequently arise (DOL Fact Sheet #66). An estimate built by classification shows those costs before bid day.

Davis-Bacon vs prevailing wage: what is the difference?

“Prevailing wage” is the general term. Davis-Bacon is the federal law. The US Department of Labor says the Davis-Bacon and Related Acts apply to contractors and subcontractors on federally funded or assisted contracts over $2,000 for the construction, alteration or repair, including painting and decorating, of public buildings or public works. The Related Acts cover federally assisted work, such as projects under the Federal-Aid Highway Acts (DOL).

Many states have their own prevailing wage laws for public work, with their own thresholds and rates, and the DOL says a DBRA project may also be subject to state and local prevailing wage requirements. Examples from the DOL table of state thresholds, last revised January 1, 2023 (DOL state table):

StateThreshold in the DOL table
California$1,000 (Labor Code Section 1771: over $1,000)
New YorkNo dollar threshold
Pennsylvania$25,000
TexasNo dollar threshold
Florida, Georgia, North CarolinaListed among states without prevailing wage laws

The DOL says to check the state labor office for official information. Whether a law applies to your job is a question for the agency or your attorney.

Prevailing wage fringe benefits: how they enter the estimate

The DOL defines the Davis-Bacon prevailing wage as the combination of the basic hourly rate and any fringe benefits listed in the wage determination. The obligation can be met by paying it all as cash wages, or as cash plus employer-provided bona fide fringe benefits, and it must be paid for all hours worked on the site of the work (Fact Sheet #66).

So each classification carries base rate and fringe as two columns: price the fringe as cash or credit your own bona fide plan. Your burden goes on top at your rates. On prime contracts over $100,000, the DOL says the Contract Work Hours and Safety Standards Act requires one and one-half times the regular rate for hours over 40 in a workweek, so overtime is its own line.

Reading the wage determination: classifications and conformance

SAM.gov describes a wage determination as a set of wages, fringe benefits and work rules that the US Department of Labor has ruled to be prevailing for a given labor category in a given locality. Davis-Bacon determinations are published on SAM.gov for agencies to put into covered contracts (SAM.gov). We price the determination and modification your bid documents name.

When the work needs a classification the determination does not list, the federal rule (29 CFR 5.5(a)(1)(iii)) requires it to be added by conformance, and conformance is appropriate only when the work is not performed by a classification already listed and the classification is used in the area by the construction industry. We list each such line as an open question so you can raise it before bid day.

Have plans for this scope? Send them over. Fixed quote within 2 business hours. Plan review is free, and you pay only after you accept.

Get a fixed quote

What Bidmere delivers on a prevailing wage bid

  • Quantities by trade, area and sheet
  • Labor hours by classification at your production rates
  • Base rate and fringe per classification, with the determination number you priced
  • Burden and overtime as separate lines, and an open questions list

We do not prepare certified payroll, give legal advice or certify compliance. You review the classifications and set the final number.

What should you send for a prevailing wage estimate?

  • Drawings, specifications and addenda
  • The wage determinations in the bid documents, with modification numbers
  • Your crew mix, production rates, burden and fringe plan contributions

Single-trade estimates are from $195 and takeoff-only work from $149, ready in 48 hours after you accept a fixed quote. You get the fixed price and delivery date within 2 business hours, plan review is free, and you pay only after you accept.

Estimate format

What a prevailing wage labor sheet looks like

Takeoff lineClassificationBase rateFringeHoursNote
Metal stud framingFrom the WDFrom the WDFrom the WDYour rate
Taping and finishingFrom the WDFrom the WDFrom the WDYour rateCheck the WD lists it
CleanupLaborer, if listedFrom the WDFrom the WDYour allowanceOpen question if not

Column layout only. Rates come from the wage determination (WD) in your bid documents.

Before you send plans

Common questions about handing off the work

Do you tell me whether Davis-Bacon applies?

No. Coverage is a question for the agency or your attorney.

Do you do certified payroll?

No. The estimate is for bidding.

Who decides the classifications?

You do. We propose one per line.

Monthly estimating plans

Bid public work every week? Put estimating on a monthly plan

A monthly plan suits contractors who price this work every week. Starter is $1,395 per month for up to 6 bids. Pro is $2,595 per month for up to 12 bids. Scale is $4,795 per month for up to 25 bids. Each bid follows the same process as a single order: your documents, your rates, your review and your final number. Ask about monthly estimating plans to compare the tiers.

Questions

Frequently asked questions

How much does a prevailing wage estimate cost?

The same as any Bidmere estimate: single-trade estimates are from $195 and multi-trade estimates from $1,150. You get a fixed price and delivery date within 2 business hours, plan review is free, and you pay only after you accept. See pricing.

Is Davis-Bacon the same as prevailing wage?

Davis-Bacon is the federal prevailing wage law for federally funded or assisted construction contracts over $2,000. “Prevailing wage” also covers state laws, which set their own thresholds and rates.

Are fringe benefits part of the prevailing wage?

Yes. The DOL defines the Davis-Bacon prevailing wage as the basic hourly rate plus any fringe benefits in the wage determination. It can be paid in cash, or as cash plus bona fide fringe benefits.

Get a fixed quote

Share the project basics. You get a fixed price and delivery date within 2 business hours. Plan review is free, and you pay only after you accept.

A sentence or two is enough. Leave private rates out of this box.
Add details (optional)
Share a view-only link if you have one. It lets us quote faster; you can also send documents after we reply.
Prefer a call? Leave a number and a time
Optional. We still reply by email, and call only if you ask here.

Preparing the form…

* Required. We reply by email within 2 business hours. Plan review and quotes are free.

Sources

Fixed price in 2 business hoursGet a quote