A bid package means two things
When an owner or a general contractor “issues a bid package”, it means the documents bidders price from. When a contractor “submits a bid package”, it means everything the bidder sends back. A GC also splits a project into trade bid packages, one per scope, to collect subcontractor bids.
The owner’s bid package: what bidders receive
- Invitation or advertisement for bids, with the due date and place
- Instructions to bidders
- The bid form, with base bid, unit prices and alternates
- Bid security and bonding requirements
- Contract terms and general and supplementary conditions
- Drawings and specifications
- Addenda issued before the bid
Short on time? Send the RFP or bid documents and we do this for you. Fixed quote within 2 business hours. Plan review is free, and you pay only after you accept.
Get a fixed quoteThe contractor’s bid package: what you send back
- The completed bid form, signed
- Bid security, such as a bid bond, where required
- Addenda acknowledgment
- Required forms: certifications, affidavits, participation forms
- Qualifications or experience statements if asked for
- Anything else the instructions list, in the order they list it
Bid package checklist
Read the instructions to bidders and turn each requirement into a line you can check off. A requirements matrix does this. See the bid preparation checklist and the compliance matrix.
Bid package example
The Bidmere sample bid package shows a requirements matrix and outline. For the pricing side, the bid sheet template lays out base bid, unit prices and alternates.
Getting a bid package prepared
Bidmere prepares bid and proposal packages for contractors to review, sign and submit: a requirements matrix, proposal drafts, organized forms and attachments and a final review checklist. Packages are from $1,950 and ready in 5 business days.
Frequently asked questions
What is included in a bid package?
From the owner: the invitation, instructions to bidders, bid form, bonding requirements, contract terms, drawings, specifications and addenda. From the contractor: the completed bid form, bid security, addenda acknowledgment and the forms the instructions require.
What is a trade bid package?
A general contractor splits a project into scopes, such as concrete or drywall, and sends each scope to subcontractors as its own bid package.
Who prepares the bid package?
The owner or its design team prepares the bid documents. Each bidder prepares its own submission; some contractors hire help to assemble it.
How much does it cost to have a bid package prepared?
At Bidmere, bid and proposal packages are from $1,950 and ready in 5 business days, with a fixed quote within 2 business hours.